top of page
> 1300
Budget =
=
> 856 000
Start :
5/23/25
🟡 In progress
End :
Currently, the children use latrines in poor condition, consisting of just one hole. As the school has no water supply, the children pump water from a few meters away, carrying heavy buckets of water throughout the day. It is with this collected water that the children wash their hands.
The latrine renovation work involves tiling the floor and walls, installing a roof, sanitary facilities, hand-washing areas adapted to the children's size, and a top ventilation system.
Current situation (22/05/2025)
bottom of page